Daivis Virbickas EN
5 articles
One of the most important preparation steps towards synchronisation – the Baltic power system isolated operation test will take place in 2019. This August, the study determining technical conditions for the test as well as preparatory measures, was completed.
In 2016, the final electricity consumption in Lithuania totalled 10.47 kilowatt hours (or 10.47 terawatt hours, TWh). A record growth in the consumption was observed last year: residents, businesses, agriculture and transport used 4.5% more electricity compared to 2015. The growth rate in agricultur...